Skip to product information
1 of 1

The UFH Group

Insulation Edge Roll

Insulation Edge Roll

SKU:BM01742


Prevents thermal bridging

Can be used with all types of flooring

Suitable for use with underfloor heating

Regular price

£14.28

inc. vat

Regular price Sale price £14.28

inc. vat

£11.90

ex. vat

Sale Contact us for availability
Shipping calculated at checkout.
Standard delivery by
holidays_raw="2026-04-03, 2026-04-06, 2026-05-04, 2026-05-25, 2026-08-31, 2026-12-25, 2026-12-28, 2027-01-01," | cutoff=17:30 | days=5
View full details

Insulation Edge Roll

The UFH Group's Insulation Edge Roll is an essential UFH component designed to ensure a seamless and effective insulation process. It's primarily used around the perimeter of a room during the installation of an underfloor heating system, to prevent thermal bridging and accommodate for the natural expansion and contraction of the screed.

Our Insulation Edge Roll is designed for easy installation, Made from high-quality materials, it provides a robust and durable barrier, ensuring optimal thermal efficiency for your underfloor heating system. Our perimeter expansion border edging strip has a PVC apron to enable to be taped down to PVC vapour barrier making a perfect seal.

FAQs:

Q: What is the purpose of the Insulation Edge Roll?

A: The Insulation Edge Roll serves as a buffer between the floor slab and the wall. This prevents thermal bridging and allows for the natural expansion and contraction of the screed, thereby reducing the risk of cracking.

Q: How is the Insulation Edge Roll installed?

A: The roll should be placed around the perimeter of the room at the wall-floor junction. It also has a PVC apron to enable to be taped down to PVC vapour barrier making a perfect seal. Once your insulation and heating system are installed, you can trim the roll level with the surface of your screed.

Q: Is the Insulation Edge Roll necessary for my underfloor heating installation?

A: Yes, it's highly recommended. The Insulation Edge Roll plays a crucial role in the overall efficiency and durability of your underfloor heating system, preventing thermal bridging and allowing for expansion and contraction.

Q: Can the Insulation Edge Roll be used with all types of flooring?

A: Yes, our Insulation Edge Roll is designed for use with all types of flooring in conjunction with an underfloor heating system.

The UFH Group's Insulation Edge Roll is a testament to our commitment to providing high-quality, comprehensive solutions for your underfloor heating needs. It is easy to install and crucial for the longevity and efficiency of your heating system.

Pallet Delivery Charges

Services Delivery Charge
Standard Delivery:  3-5 working days £25.00
Express Delivery:  2-3 working days £35.00
Next Day Delivery:  Order before 12pm (midday) £50.00

Parcel Delivery Charges

Services Delivery Charge
Express Parcel £9.99

Collections

To collect your order, please email us at sales@theufhgroup.co.uk with your contact details, along with the products and quantities you require. Our team will review your email and respond with a secure payment link. For your security, we do not process payments over the phone. Once payment is received, your order will be processed, and our team will notify you when it’s ready for collection.


  • Delivery charges will automatically be calculated within the checkout process.
  • Orders are only processed for delivery between 8:00am – 5:00pm Monday to Friday, excluding bank holidays.
  • Moffett offload will be used for large bulky deliveries and only when agreed with you.
  • Please advise of any access issues when ordering.
  • Delivery is kerbside only.
  • If your delivery is incorrect or damaged, please notify us immediately and mark any issues on the delivery note.

Where We Deliver

Delivery Areas

  • We have a fleet of FORS delivery vehicles with Moffett mechanical offloads that deliver nationwide. Sometimes we may use third-party carriers for smaller orders.

Product Delivery Times

  • The vast majority of orders are dispatched within 2 working days. This can occasionally be up to 4 working days — please contact us if you need something urgently.
  • Speciality items may take up to 5–7 working days.
  • We aim to contact you within 24–48 hours of your order being placed to confirm delivery times and dates.

Customer Reviews

Based on 10 reviews
100%
(10)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
J
John C. (Hartlepool, ENG)
Looks good but yet to be

Looks good but yet to be installed

D
David R. (Stockport, ENG)
Great quality sheet for UFH

Great quality sheet for UFH, consistent finish both sides

T
TREVOR B. (Gloucester, ENG)
good

good

J
John C. (City of Westminster, ENG)

Ace

M
Michal C. (Sheffield, ENG)
5mm x 100mm x 50m
Edge roll

Very good

D
David I. (Leeds, ENG)
Delivery

Very prompt delivery

Get in Touch with The UFH Group